Specialty
Air Quality
SECTOR
Industrial
TYPE
Environmental Study
CLIENTELE
Local Government
TIMESPAN
2013LOCATION
Salem, MA
Project Number:
3814Salem Port Expansion
SERVICE:
Mobile Source Greenhouse Gas Analysis
DESCRIPTION:
Tech performed a greenhouse gas emissions analysis for the Salem Port Expansion, consistent with the Executive Office of Energy and Environmental Affairs (EOEEA), Greenhouse Gas Emission Policy and Protocol. The goal was for the City of Salem to obtain a permit to construct improvements to the existing marine terminal and to create an ADA compliant pedestrian access-way. Tech performed a mobile source study for three scenarios- No-build, Build, and Build with Transportation Demand Management (TDM) measures. Within this mobile source study, the CO2 emissions were calculated for different traffic analysis scenarios. Tech found that implementing the appropriate TDM measures would reduce CO2 emissions by 2.0 percent. EOEEA Secretary accepted the results of the GHG and provided a certificate of approval on the EIR.