• Specialty

    Noise / Vibration
  • SECTOR

    Municipal
  • TYPE

    Environmental Study
    Permitting / Compliance
  • CLIENTELE

    Private Sector
  • TIMESPAN

    2013
  • LOCATION

    Huron County, MI

Project Number:

3759

Harvest II - Compliance Sound Testing

SERVICE:

Sound Study

DESCRIPTION:

The Harvest II wind farm operates with 33 Vestas V100-1.8 MW wind turbines. Tech performed sound compliance testing at 10 locations in three Townships. Tech analyzed the data and concluded that the sound pressure levels comply with the limits in both the Huron County Ordinance and in Township Ordinances. Tech presented the results in a public hearing before the Huron County Commissioners.

Print   Email

Key Points

  • Tech performed sound compliance tests for the Harvest II wind farm in Huron County, Michigan and presented the results in a public hearing before the Huron County Commissioners.
  • They confirm the wind farm fully complies with sound limits in the Huron County Ordinance and applicable Township Ordinances.