• Specialty

    Noise / Vibration
  • SECTOR

    Commercial
  • TYPE

    Environmental Study
    Permitting / Compliance
  • CLIENTELE

    Private Sector
  • TIMESPAN

    2008
  • LOCATION

    Arlington, VT

Project Number:

2907

Arlington Verizon Towers

SERVICE:

Sound Level Compliance Assessment

DESCRIPTION:

Two cell phone towers, serving multiple wireless carriers, in Arlington, Vermont, operated by TowerCo, required sound compliance testing in a rural area, to satisfy the Town of Arlington zoning ordinance.

Tech Environmental performed sound level compliance testing at the TowerCo sites with technicians present from all tenant wireless carriers to turn on HVAC equipment and emergency generators for the testing. The testing concluded that the facilities' sound levels complied with the Town's Zoning Ordinance limit at all property lines and beyond, which was extremely restrictive because of the rural location.

Print   Email

Key Points

  • The Town of Arlington, VT questioned whether two cell phone towers, which serve multiple carriers, produced sound levels that exceeded the Town's noise ordinance.
  • Tech demonstrated that the sound from the multicarrier cell tower system was not excessive.